PROJECT SHOWCASE

Bunbury Outer Ring Road

Engaged by SWGA (South West Gateway Alliance) in the role of 'Survey Manager' of the $1.45B road construction project. 

Some duties of role as per below:

- Liase with and support digital engineering manager, construction team and design team

- Organise work schedules

- Provide mentoring, relief and support for surveyors and engineers

- Create and maintain all digital data for earthworks, pavements, structures, noise and retaining walls, drainage, services, temporary works for survey parties and machine control (340+design revisions). Machine and survey digital data creation for all brands.

- Report and compiling of design quantities/quantities completed throughout various phases of the project including tendering phases (Alliance model contract requiring multiple reiterations)

- Process all as-builts/QA reporting

- Document control of drawings

- Overall high manager responsibility

 

 

 

 

 


Waterbody One Bulk Earthworks, Worsley Alumina

Engaged by B&J Catalano to manage all survey tasks and final QA deliverables of bulk earthworks, dam lining and various works project. 


Greenbushes Tailings Retreatment Project

Engaged by B&J Catalano to manage all survey tasks and final QA deliverables of bulk earthworks project. 

Including design verification, earthworks volumetrics, clash detection, services and drainage setouts and as-builts.

 



Frances Creek Iron Ore Mine, NT

Engaged by CCMS/AXIS to cover surveying services of above ground mine site.

This includes: Liaising with technical services team and upper management to assist at all levels, control network verification, conduct timely volumetric surveys and reports, produce imagery, produce environmental management plans. etc.




MSA & Camp Access Roads Overpass of CV22, Roy Hill

Engaged by Riverhill Contracting to manage all survey tasks and final QA deliverables of bulk earthworks project. 

Including design verification/modification, earthworks volumetrics, monitoring, setouts and as-builts.

 



DN450 Sewer Pressure Main, Centurion Way Transfer Main, Busselton

Oversee survey works for 1.6km of sewer pressure main works constructed for the most part with directional drilling.